The report contains ten-year analysis with the following sections
contact us for pricing
Check out our sample pages |
Many companies now available
Search to find companies of interest
read summary of their published patent
the company report contains more information
Title of patent family (most common patent title) |
Family members |
Filing year |
---|---|---|
tunnel information tracing accurate grouting method | 2 | 2010 |
folding tunnel widening trolley | 2 | 2012 |
method for constructing tunnel with low-half cross section being dry powder and fine san… 🛈 | 2 | 2012 |
positioning support for dowel bars at concrete pavement joints | 2 | 2012 |
slurry proportioning and construction method for reinforcing dry powder fine sand layer … 🛈 | 2 | 2012 |
comprehensive construction method applicable to controlling arch basement sedimentation … 🛈 | 2 | 2012 |
bridge prestress tensioning control and feedback method | 2 | 2012 |
construction method for miniature steel pipe concrete pile to penetrate through roadbed … 🛈 | 2 | 2012 |
construction method of fully pouring tunnel inverted arch | 2 | 2012 |
method for disassembling, lifting and transferring closed type station shield to transfe… 🛈 | 2 | 2012 |